1. Home
  2. Solutions
  3. Construction AI

03 · AI & digital transformation

Construction AI copilot and field app

An application built for your project: the site foreman records the daily report from a phone, the site engineering team checks subcontractor quantities, and the project manager prepares the payment application with every quantity backed by its report, delivery note or photo.

  • Daily reports from a phone
  • Production by work front
  • Subcontractor quantities
  • Source-linked queries
  • Draft payment application
Civiltek Site · Production controlOpen ↗
Civiltek Site production dashboard with 56 asphalt paving reports and a chart per record

Where control is lost

Too much paper between the work front and the payment application.

The problem is rarely a lack of data. The daily report is in a notebook, the delivery note in a WhatsApp photo, the subcontractor's measurement in a spreadsheet and the instruction that changed the detail in an email.

01

Incomplete reports

Work fronts without quantities, days without a report or unclassified activities that nobody notices until month end.

02

Unchecked quantities

The subcontractor's valuation is paid against its own figures, not against what was recorded on site.

03

Untraced changes

Revised drawings, instructions from the engineer and new items awaiting a rate.

04

Payment applications in the dark

On the last day, the month's production is rebuilt from memory, loose sheets and phone calls.

Case study · Real anonymised data

Resurfacing of an airfield

We started from the paving reports of an airport resurfacing project carried out between April and June. The application sorts them, classifies them by layer and flags the ones that need checking before measurement.

Reports
56
Tonnes
23,692 t
Gap detected
300 t
Production
Each report with date, layer (surface course, binder course, base course and regulating wedges) and tonnes; daily chart and filters by month and activity.
Subcontractors
The subcontractor's measurement is cross-checked against the reports: tonnage differences, days without data and items outside the contract.
Contract
The schedule of rates is linked to each item, so production can be valued without leaving the application.
Result
Cross-checking the 56 reports, the application found that the running total on the production sheet was 300 t short of the sum of reports from report no. 33 onwards, plus a duplicated report and one at 8.6 t/m against about 3.1 t/m usual for the surface course. These are the errors that reach the valuation if nobody spots them.
Review the 56 reports in the demo →
Site log · RUN-006 to RUN-067Open ↗
List of site reports with tonnes per day and pending checks

Field app

The daily report, from the work front, in one minute.

The foreman picks the work front on the map, enters quantities, labour and plant, and attaches photos and delivery notes. The record reaches the office with its author, time and location.

  • Forms per work front. Each activity asks only for the data that will be measured and paid.
  • No signal. Offline working with synchronisation once the connection returns, where the project needs it.
  • Reviewed and approved. Proposed, reviewed and approved data are kept apart; every correction keeps its history.
Try the field app →
Civiltek Field · Field workOpen ↗
Field application with an asset map and a list of inspections

AI copilot

Ask your project. With the source in front of you.

The copilot reads the project's daily reports, design, minutes and instructions. Every answer links to the document and page that support it, and it warns you when information is missing or contradictory.

  • Design and variations. Drawings, specification, minutes and instructions in their current version.
  • Production and costs. Daily reports, delivery notes, test results and subcontractor measurements.
  • Permissions. Each user only queries what they are allowed to see.

Which June surface-course reports still have measurement pending?

The highest-tonnage report in June is the one from the 14th: 651.7 t of surface course. Reports with open checks are flagged in the production log.Source · Site log, June

Which instruction changed the thickness of the binder course?

I cannot find any instruction that changes that thickness. Check the setting-out record or ask the engineer to confirm.No source · insufficient information

Month-end close

From the reviewed report to the draft payment application.

Reviewed quantities are allocated to the bill of quantities items. The application prepares the valuation and separates whatever cannot yet be paid.

A

Recorded production

What the foreman has recorded in the field, with its evidence.

B

Validated quantities

What the site engineering team has checked against drawings, tests and subcontractors.

C

Pending approval

New items, overruns and work without an agreed rate, kept apart from the rest.

Quantities, rates and payment applications are always approved by the responsible people. The application prepares the draft and gathers the evidence.

Roll-out

We start with one work front. Not the whole company.

A pilot on a live project, with its foreman and project manager, before extending it to other sites.

  1. Project structure

    Zones, work fronts, bill of quantities items, subcontractors and responsibilities.

  2. Field forms

    What the foreman captures and who validates each piece of data.

  3. Site pilot

    Daily use, weekly adjustments and the first queries to the copilot.

  4. Extension

    More projects, integration with your ERP or document management system, and training.

Frequently asked questions

Construction copilot: what clients usually ask

Does it replace the company's ERP or estimating software?

No. It captures what happens on site and prepares it for your systems. Integration with the ERP, measurement software or document management system is defined after reviewing their interfaces.

Does it work on sites without mobile coverage?

Yes, when the scope requires it: the application stores records on the phone and synchronises them when the connection returns.

Does the AI approve quantities or payment applications?

No. The copilot searches, cross-checks and prepares drafts with their sources. Quantities, rates and payment applications are approved by the designated people.

Can it be adapted to the way we work?

It is a bespoke application: forms, statuses, permissions and outputs are defined with your team, starting from a pilot project.

Where is the project data stored?

Hosting, the AI provider and its terms are agreed with the company before any documents are uploaded. Code ownership and data export are set from the outset.

A pilot on your project

Tell us what gets lost today between the site and the office

With a sample daily report, a subcontractor valuation and the project budget, we prepare a pilot proposal.

CIVILTEK / ENGINEERING AND TECHNOLOGY

What do you need to transform?