Modelling and inventory
Reconstruction from CAD or PDF, equipment classification and component identification using the codes the plant already uses.
BIM modelling →03 · AI & digital transformation
From an archive of drawings and manuals to equipment you can open part by part: each component with its documentation, inspections and work orders, and the planned outage prepared well in advance.
What we build
For industrial contractors, concession holders and operation and maintenance companies at factories, power plants, water treatment works and process plants.
Reconstruction from CAD or PDF, equipment classification and component identification using the codes the plant already uses.
BIM modelling →Manuals, data sheets, drawings and history attached to each part. This is the base the document copilot answers from.
Document copilots →Inspections, findings, work orders and close-out evidence in an application built around your process.
O&M applications →Demonstration · Fictitious equipment
A turbine of our own design, to scale, to show how a digital twin is used: select a part, measure it, check its data sheet and open an inspection order.
Demonstration · Fictitious contract
For the maintenance contractor: which intervention is coming up, what still has to be prepared for the outage and which additional work needs the client's approval.
How we start
We choose the asset that causes the most outages or queries and digitise it completely before moving on to the rest of the plant.
CAD or PDF drawings, manuals, spare parts lists and intervention history.
Geometry, breakdown and equipment codes aligned with your CMMS.
Inspections, orders and outages with the statuses and permissions of your process.
Connection with the CMMS or ERP after reviewing their interfaces, and extension to more equipment.
Frequently asked questions
Not necessarily. We can rebuild the geometry from PDF drawings; the geometric scope and checks are agreed for each facility.
No. The twin provides the geometry and documentation by part; work orders can stay in the CMMS and be synchronised where its interfaces allow.
It can, if the plant has the data and access is authorised. The connection is defined and tested in each project; it is not a requirement to get started.
They do not replace a physical measurement or the manufacturer's drawings. The model shows which document each dimension comes from and with what accuracy.
Your facility
Send us its drawings and manual and we will propose how to turn it into a digital twin and a maintenance application.